Apr 11, 2010
Mar 29, 2010
This Week 10
Doing artist statements, find it hard to write and have been searching for examples to guide me.
Scripting part, still on progress . . . . .
(exploring)
Mar 11, 2010
Testing
I am now testing the output of the video, on:
How is the lightning, does it look too dark?
How is the composition setting, do the talents sit too near?
Does the color suit the background environment?
There are many question to be asked and answer, I just listed a few. Somehow I am trying to make the content look like a real world of television addiction people.
This video look simple but had been edited for more than 10 hours. Had tried to put a living room's image as background but it look too distracting so I decided to put a brick background to make the audience focus on the talent/person.
Now I am far from the original schedule.
Mar 4, 2010
Feb 24, 2010
Convert Mini Tape DV
Finally my recording mini tape successful converts into my computer. My computer didn’t have fire wire hole and found out only one of my house mates have it (she bought a new cpu). I searched a lots of tutorial on how to capture video, the links were very useful but there is no manual guide for the handy cam’s setting.
How to transfer video from handy camcorder to pc using a fire wire cable:
http://www.ehow.com/how_2005440_camcorder-pc-ieee1394.html
Feb 23, 2010
What Sound Looks Like
I found this video interesting, just want to share and hope it can help in Ming Jie's installation.
Problems
I had difficulty to convert VFS tape into computer. My friend Yoong Pang helped me to capture the video using adobe premier for 1 hour yet he unsuccessful convert it. The adobe premier setting were all correct but the problem is from the handy camera that i borrowed from school. Later need to ask others FA students for help.
Feb 21, 2010
Week 5 Touch Up - critic 1
Things to do after critic 1:
1. Storyboard
2. Measurements/ space planning
3. Content Development/ digital content
Additional things
1. Budget planning
2. The Making
Flow Chart
I used Smart Draw 2010 to create this flow chart. It was as easy as pie for the first time user. Click and drag will do. I have spend almost 2 hours for looking its keygen and crack, but a lots of them needed to pay or the file broken during the download period. Until now, still waiting for the crack and have to wait 1 hour to finish downloading. So I decided to print screen, it’s a bit blur ~ ~ ~
Feb 17, 2010
Feb 8, 2010
Critic 1 (2010)
1. Flow Chart
2. Diagram
3. Space Planning
4. Digital Content/ Story Board
5. Technical Details
To Do List (Week 4)
1. Borrow handy cam from FCM one stop center (9/2/2010)
2. Borrow lightning equipments (9/2/2010)
3. Borrow sofa from school for shooting (10-11/2/2010)
4. Borrow second handy cam from friend (12/2/2010)
5. Book green screen room (9/2/2010)
6. Buy S-video cable (9/2/2010)
7. Buy wireless mouse (9/2/2010)
8. Buy external usb cable (9/2/2010)
9. Buy empty cds and dvds (9/2/2010)
10. Collect unwanted hair from salon (9/2/2010)
11. Buy plastic cd cover (9/2/2010)
12. Check tape recording price (9/2/2010)
13. Buy makeup equipments (9/2/2010)
Today morning going to Low Yat and Times Square to buy basic installation equipments. Will on the way to watch Avatar 3D as well. I am going to estimate my installation budget.
February 08, 2010 – Consulted diagram and both lecturers had giving opinion which had open up my mind. Observe other classmates’ installation problems, during consultation period. Success collect Mr.Kok Yong signature to borrow handy camera from school. (2.10 am)